The work to fabricate and install the rollover structure for the fuselage lasted from January 2023 through early February 2023. It was relatively straightforward, though the structure is beefy. Luckily, everything lined up perfectly. Of note is the first picture, which is the first of me in the fuselage with the aleron and elevator systems connected to the control stick…