And then there was heat

After a lot of research, I settled upon a heating system that leverages a hot water heater to circulate heated water through plastic pipes that I laid within the slab.  It’s highly efficient and creates a gentle, even heat throughout the space.  For the second floor, i added a second zone with slightly cooler water to be compatible with the…

Continue reading

Dry wells and Drywall

After some winter delay, work on installing the dry wells was able to re-start and complete. The whole purpose of these monster concrete tanks are to collect and disperse rainwater collected from the gutters. Being that the building is in the middle of the woods with no neighbors within seeing distance, the requirement is quite ridiculous. But being a good citizen…

Continue reading

What is my mission? Setting the criteria for evaluating kitplanes

Previously, I shared some thinking about how I plane to build a kit airplane in the future (after The Barn is complete), and which three models I narrowed my selection to.  This post gives more insights into how I begin framing the selection decision and the nuances of each design. The Mission In comparing these three kitplanes, there is no…

Continue reading

Arion Lightning XS

Which to choose?

Even before I earned my Private Pilot Certificate in 2013, the idea of building a kit plane had taken root.  But even since thinking about this for some years, I am still undecided on which model to build.  Though, this decision is not required for a year or two while I finish building the barn.  In the interim, I continue to…

Continue reading

All volunteers and staff from the 2015 Team Rubicon NYC Fundraiser

Team Rubicon 2015 Salute to Service Awards

Was honored to help volunteer at the TR National Fundraiser.  We setup in the Federal Armory downtown NYC and staged a Command Center within so attendees could get a sense of what’s involved when deploying to a disaster.  It was run by Headquarters staff supplemented with leaders and volunteers from Region II. All the pictures were taken by TR staff/leadership…

Continue reading

Region II Chainsaw Operator Training

Region II planned and hosted a Chainsaw Operator training in April that was just fantastic.  Even though I’ve gotten chainsaw training from during my time in the Fire Service, those experiences were primarily focused on opening roofs for even operations.  After Hurricane Sandy I got a lot of hands-on experience working through the many, many downed trees on our property…but without ‘real’ training.  Youtube does have a great deal on the topic, but nothing like learning from experts in person.

Our instructors, Alan and John, came down from Region I and were top notch.  Some of the best field training I’ve ever received.  The group was attentive, safety focused, and fun to be around.  Below are just some of the pictures that Region II posted.  Again, these are not my photos and are part of this public album

 

My first Team Rubicon Service Project – 2015.12.06

I arrived early in Sea Bright on the 12th of December to participate in my first Team Rubicon service project.  Didn’t really know what to expect.  Found a bunch of folks hanging by their cars seemingly waiting for someone in charge to show-up.  Quick introductions – everyone was friendly.  We made our way to the main building and eventually everyone assembled and Todd introduced us to the local volunteers we were supporting.

I was immediately impressed with the caliber of folks in TR.  No egos, ready to get down and dirty, and no show-offs.  My type of folks.  It started raining pretty early and continued throughout the day – coming down really hard at some point.  It became obvious it was no simple project and we got the main platform done by days-end.  Loved it.  Wanted to do more.

TR Region 2 posted this summary on Facebook

This slideshow requires JavaScript.

Footings excavated

Construction Begins – November 2014

Construction of the foundation completed in November.   Before pouring the slab, I ran all the 5/8″ PEX lines that will be used to heat the first floor through hot water.   Here you can see the manifold.  It is pressurized so I can tell if any leaks occur during the pouring of the slab   The slab required 20…

Continue reading